RedSky has a proven track record in power system operations and planning, ensuring system reliability, regulatory compliance, and operational efficiency across real-time and long-term horizons.
Our experience encompasses:
-
Transmission system planning in all time horizons.
-
Developing and implementing operational procedures and planning criteria to align with NERC and regional reliability standards.
-
Integrating lessons learned from event analyses and operational performance trends.
-
Interpreting evolving regulatory requirements and translating them into practical operational and planning processes.
-
Oversight of real-time and near-term control room activities.
-
Technical power system studies.
-
Safe and reliable dispatch of generation.
-
Secure operation of transmission facilities.
-
Collaboration with NERC Transmission Operators, Balancing Authorities, and Reliability Coordinators.
-
Coordination of outage scheduling.
-
Strategic planning
-
Monitoring system conditions and managing contingencies in compliance with NERC standards.
-
Conducting comprehensive load flow, contingency, and dynamic stability studies to assess the capability of the bulk electric system under various conditions.
-
Ensuring proposed system changes maintain grid reliability and meet interconnection and transmission service requirements.
-
Interconnection and transmission capability assessments, leading technical reviews, coordinating with engineering teams, and facilitating stakeholder discussions to address concerns, validate assumptions, and ensure consistency with applicable standards.
-
Developing and enforcing resource adequacy criteria, helping to forecast demand, assess capacity contributions, and evaluate the impact of variable generation on system reliability.